These are the pushrod tubes. I don't think they're steel, but they can still rust, so they need to be painted.
The heads are slid on, then the hydraulic lifters and under-cylinder baffling can be installed, followed by the pushrod tubes. Then the heads can be torqued down.
Total Time: 5.5 hrs.